FAQs: Bathroom, Kitchen & Granny Flat Renovations Sydney
Planning a home upgrade in Sydney is exciting, but it often brings a whirlwind of questions regarding local regulations, realistic budgets, and…
Read the guideCustom granny flats for rental income or family, designed for your block, approved through CDC or DA, and built turnkey by one licensed builder under a fixed contract.
Written & reviewed by Jason Davies, licensed builder · Updated November 2026
Turnkey · CDC approvedMost delays happen before a single footing is poured. We handle drawings, certifier and council so construction starts on time.
Five commitments written into every JD Pro Build contract, so you know exactly what you’re signing up for.
Your quote is itemised. It only changes if you ask for a change, and never without a written price first.
The handover date goes in the contract and we order materials weeks ahead to keep it.
Your site manager reports progress every week, with photos, so you’re never chasing anyone.
Floors and furniture protected, rubbish removed and a professional clean at handover.
Workmanship warranty in writing, plus HBCF cover and compliance certificates handed over.
One contract and one point of accountability for the entire lifecycle of your build.
Zoning, lot size, sewer, easements and access checked before any design fee.
Custom 1-, 2- or 3-bedroom layouts that use every square metre of the 60 m² limit and keep privacy from the main house.
Drawings, BASIX, engineering and lodgement with a private certifier or council.
Engineered slab, steel or timber frame, roof and windows — inspected at every stage.
Water, sewer, stormwater and electrical connections, separate metering on request.
Kitchen, bathroom, flooring, painting and landscaping, ready for tenants or family.
Under the NSW Housing SEPP, most residential lots can add a secondary dwelling. These are the four numbers we check first.
Send us your address. Within 48 hours a builder checks zoning, lot size, sewer lines, easements and trees, and tells you whether CDC or DA applies.






Turnkey pricing depends on size, site conditions and finishes. These ranges are typical of the Sydney projects we quote.
$150k – $180kApprox. 40–45 m²
$180k – $220kApprox. 55–60 m²
$220k – $250kSplit-level, raised floor, DA
Ranges are indicative. Site costs (excavation, rock, sewer diversion) are assessed at the free feasibility check and included in your fixed price.
| Stage | What happens | Typical duration |
|---|---|---|
| Feasibility & design | Site check, concept plans, fixed quote | 2–4 weeks |
| Approval | CDC through a private certifier (DA takes longer) | 3–6 weeks |
| Slab & frame | Set-out, slab, frame, roof, windows | 4–5 weeks |
| Lock-up & fit-out | Cladding, linings, kitchen, bathroom, flooring | 6–8 weeks |
| Handover | Occupation certificate, clean, keys | 1 week |
4.8★ average on Google across bathrooms, kitchens and granny flats.
“Built a high-spec granny flat for my parents. The process was seamless and they handled all the council paperwork without any fuss.”
“JD Pro Build transformed our dated 80s kitchen into a modern masterpiece. The fixed quote gave us peace of mind and they actually finished two days early.”
“Excellent attention to detail on our bathroom tiling. The project manager was communicative and professional. Highly recommend for high-end work.”
Under the NSW Housing SEPP a secondary dwelling can have a maximum internal floor area of 60 m². Decks, verandahs and carports are not counted in that figure.
Generally you need a residential-zoned lot (R1, R2, R3, R4 or RU5) of at least 450 m² with 12 m width at the building line to use the fast CDC path. Smaller or constrained lots may still be approved through a DA. We check your block for free.
A Complying Development Certificate (CDC) is a fast-track approval from a private certifier when your design meets set standards, often within weeks. A Development Application (DA) goes to council and is needed when the site or design falls outside those standards.
Construction typically takes 12–16 weeks after approval. Including design and CDC approval, most projects go from first meeting to handover in around 5–6 months.
Yes. In NSW a secondary dwelling can be leased to tenants, which is why many Sydney owners build one for rental income. It cannot be subdivided and sold separately.
Planning a home upgrade in Sydney is exciting, but it often brings a whirlwind of questions regarding local regulations, realistic budgets, and…
Read the guideImagine waking up to the sound of jackhammers instead of your gentle morning alarm. Transforming your Sydney home is an exciting milestone…
Read the guideAdding a secondary dwelling to your property is one of the smartest ways to boost your rental income.
Read the guideBased in Canley Heights, we run granny flat builds across Greater Sydney. Not on the list? Call us: if we can deliver to our standard, we’ll take it on.
★★★★★4.8 on Google · 200+ Sydney projects · Licensed & HBCF insured
Tell us about the room or the block. A licensed builder (not a salesperson) calls you back, books a site visit and prices the job line by line.
Takes 60 seconds. Fields marked * are required.
No obligation. Your details stay with JD Pro Build and are never shared or sold.